日韩女子A级片特黄A级片精选更新,久久精品无码中文字幕老司机,国产欧美日韩在线观看视频网站,国产精品一级黄片免费观看,国产交换配乱婬视频A,国产真实露脸乱子视频观看 在线观看免费一区二区三区,国产精品va在线观看综合

Inspection and maintenance of film blowing machine

2021-03-27 4

Daily inspection and equipment maintenance

1. Check whether the temperature self-control is in good condition and the heating appliances are in good condition, and pay attention to timely adjust the heating temperature of each point within the index range.

2.Traction film thickness  Control speed.

3. Observe and adjust the uniformity of film thickness, and the folding diameter meets the standard.

4. Check the air storage cylinder pressure, which should not be too high, but there should be standby pressure.

5. Check and control the proportion of raw materials and mix them evenly.

6. Check whether there are impurities in the raw materials, especially the iron mixing with magnet in time.

7. Check the lubrication condition of gearbox and air compressor cylinder.

8. Regularly check the temperature rise and mechanical transmission of each running motor.

Film blowing machine maintenance - targeted maintenance project

1. Feeder system: clean the filter in time and check the negative pressure feeding system for air leakage.

2. Extruder system:

① Observe the current of pressure instrument and main motor, and clean the net changer in time.

② Check the gearbox, screw and main motor for noise and overheating.

③ Check the frequency, current and temperature rise of frequency converter, and clean the dust of motor and frequency converter on time.

④ Correct the error between thermocouple measurement and actual temperature.

⑤ Adjust the position of extruder, adjust the groove wheel to ensure the position angle and level of extruder.

3. Die system:

① Second heating method is adopted to avoid temperature overshoot.

② Before starting the machine, use copper scraper to clean the accumulated material, paraffin to clean the membrane mouth, and reduce the influence of precipitates on the membrane bubble.

③ After shutdown, timely cover the protective felt to avoid abrasive damage. (this method is adopted for the upper blowing machine)

④ Regularly check the temperature and current of each temperature zone and membrane heating plug-in, and correct the temperature difference.

⑤ Adjust the die level and the center point to match the traction.

⑥ A torque wrench is used to disassemble the die screw, and the specified torque is used for operation. Molybdenum disulfide grease is used for high temperature part of the screw.

⑦ It is forbidden to weld and cut the mould.

4. Wind ring maintenance: clean up the debris and dust in the wind ring in time.

5. Traction device maintenance: herringbone folding without pollution, clamping traction (cooling) roll pressure is appropriate, no condensate, flattening roll operation is flexible.

6. Corona processor maintenance:

① Regularly clean high voltage transformer, discharge roller, discharge rack, electric control box and adjust discharge gap;

② Before starting up, check the humidity of the equipment to avoid short circuit of the discharge frame, and check the running temperature of the discharge roller bearing;

③ Replace the silicone tube in time.

7. Electrical maintenance:

① Ensure the stability and reliability of the power supply, and the performance parameters meet the requirements.

② Keep appropriate temperature and humidity, keep good grounding, and pay attention to eliminate electrostatic hazards.

③ Remove radiator dust regularly.

④ It is forbidden to repair core components with points.


澎湖县| 兴隆县| 东山县| 千阳县| 庆云县| 杭锦后旗| 南丰县| 桂平市| 瓮安县| 新安县| 商水县| 巴林右旗| 光山县| 天门市| 梁山县| 达拉特旗| 汪清县| 利川市| 桃园县| 湘阴县| 壶关县| 深水埗区| 赤峰市| 马山县| 自治县| 吴江市| 榆树市| 晋州市| 灵宝市| 赣州市| 扶绥县| 长白| 施甸县| 苍梧县| 秦皇岛市| 杭锦旗| 策勒县| 岳阳市| 安图县| 海林市| 玛曲县|